We proudly announce that, we have successfully completed 41.405 Km. rigid pavement road project at Tapa-Bathinda, Punjab.
At Bhingrol village (district Amreli), an overhead tank with a capacity of 10 lakh liters was constructed for the Gujarat Water Supply & Sewerage Board in 2001-02.
Four laning of Cholapuram – Thanjavur from km. 116.440 to 164.275 section of NH-45C in the state of Tamilnadu under NHDP-IV on Hybrid Annuity Mode
Value of Work is Rs. 1220 Crores (Rupees One Thousand Three Hundred Forty Five Crores and Sixty Lakh only).
Four Laning of Sethiathoppu – Cholapuram from km 65.960 to km 116.440 section of NH-45C in the state of Tamilnadu under NHDP Phase-IV on Hybrid Annuity Mode.
Value of Work is Rs. 1323.00 Crores (Rupees One Thousand Four Hundred Sixty One Crores only).
Construction of Structure, Architectural Finishing, Electrical & Mechanical and PHE works for Old High Court Metro Station (Part of Pkg.-II of Phase-1)
Value of work Rs. 57.36 Cr.
Construction of elevated viaduct from Kadarsha Ni Nal to Althan Gam Station and 5 stations (Excl. E&M, Architectural Finishing and Roofing) for Surat Metro Rail Project Phase- 1 , Package - CS1s
Value of Work Rs. 366.47 Cr.. (Three Hundred Sixty Six Fourty Seven lakh Crores. )
Construction of Eight Lane access-controlled expressway from junction with SH-175 near Baletiya village of Panchmahal district to junction with SH-63 near Pratap Nagar village of Vadodara district (Ch. 803+420 to 824+920; design Ch. 351+000 to Ch. 372+500) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat.
Value of work Rs. 850.78 Crore (Rupees Eight Hundred Fifty Crores and Seventy Eight Lacs).
Four Laning of the Project Highway from End of Pinjore bypass Baddi Nalagarh Section Km 4.200 to 35.395 of NH21A New NH105 in Haryana and Himachal Pradesh on the EPC Mode (21.500 KM)
Value of Work Rs.469.00 Cr. (Rupees Four Hundred Sixty Nine Cr )
Engineering, Procurement and Construction Contract for Development of Access Controlled Six Lane (Expandable to Eight Lane) Greenfield ‘Ganga Expressway' (Group 3, From km. 289+300 (Village: Ubariya Khurd, Distt: Hardoi) to km. 445+000, (Village: Sarso, Distt: Unnao), design length=155.700 km) in the state of Uttar Pradesh.
Value of work Rs. 4732.57 Cr.
Construction Of GMERS Medical College And Teaching Hospital And All Related Services And Other Ancillary Work at Rajpipla District Narmada.
Value of Work Rs. 486.02 Cr.
Construction of Various Building for innovation Hub at KCG Campus, Ahmedabad.
Value of work Rs. 53.25 Cr.
Construction Of LIC Investment Building Includes Composite Civil Work and All Related Services and Other Ancillary Work at Gift City, Gandhinagar.
Value of work Rs. 113.82 Cr.
Construction Of Investment Building And All Related Services And Other Ancillary Work At Old District Court Road, Ludhiana, Punjab ( LIC of India)
Value of work Rs. 152.46 Cr.
Strengthening / Overlaying on Six lane Gurgaon – Kotputli – Jaipur section of NH 48 (Old NH 8) from Km 107+100 to Km 188+000 (80.90 Km) in the state of Rajasthan at the risk and cost of concessionaire.
Value of work Rs. 402.48 Cr.
Strengthening / Overlaying on Six lane Gurgaon – Kotputli – Jaipur section of NH 48 (Old NH 8) from Km 188+000 to Km 268+300 (80.30 Km) in the state of Rajasthan at the risk and cost of concessionaire.
Value of Work Rs. 404.65 Cr.
Road transport is one of the oldest means of transport, and with time, the evolving construction and engineering methods have made it easier to connect cities, states, and countries via a network of highways and roads.
The construction of roads and highways has become more efficient on the time constraints and safety, with significant manual labour being replaced by modern machinery. At Patel Infrastructure Limited, our primary expertise in construction is roads and highways. We took up our first highway contract in 1999-2000 with the Vadodara - Halol project, and we have continued to scale exponentially by taking on challenging projects to date.
The numbers over the years reflect the dedication and commitment of the company toward delivering the best and safe roads and highways. Patel Infrastructure Limited has raised the bar of the accuracy and swift delivery of highway and road projects. The service domain has become our speciality after registering four world records in a single day last February.
The consistency of the quality achieved in our projects is a result of the team's effort at Patel Infrastructure Limited, from the Administration to the labours on site. We take care of all the safety measures for the workers and accomplish the given tasks within the drafted timeline.
Bridges are one of the most crucial parts of a road or highway network. Without bridges, it becomes impossible to overcome the terrain differences and get the network through waterbodies. Bridges overcome the connectivity issues and are also designed and constructed to relieve the traffic congestion in cities.
We entered the bridge construction domain in 2002 and have been blessing the country with architecturally and aesthetically pleasing bridges that are optimum on the safety quotient at Patel Bridge Nirman Ltd(PBNL), a subsidiary of Patel Infrastructure Limited.
We have had the privilege of working with a vivid clientele and assisting them with their requirements for different types of bridges
The Railway overbridge near Chikhodara (Anand), Gujarat, constructed by Patel Infrastructure Limited, is one of our crown jewels in the bridge construction department. Reinforced Earth Technology was used in the construction of this bridge. Another imposing structure erected by P.I.L is the Foot Over Bridge at Ahmedabad bypass, NH-08. This heavy F.O.B. near the express highway junction is made of steel. A total of 145.00 MT of steel has gone into its construction.
Patel Infrastructure Limited has been in the market for five decades now. We proudly claim that we have explored different construction domains and have accomplished projects concerning buildings of different types.
The team's expertise and experience in the construction domain allow us to work on building construction projects that have different customised requirements depending on the purpose the building is being constructed for.
The State water data centre-Gandhinagar, with its spectacularly authentic view, was constructed in 1999. The well-equipped educational campuses of the English medium school near Borsad town and the Vrajbhoomi Vidyapeeth at Mogar, Anand, are also worth mentioning.
P.I.L. has been into the construction of buildings since 1972, keeping pace with technology. Every conceivable facility, viz. Technology Bhavan, L.R.C. Bhavan, Students Amenity Centre, workshops, hostel, principal's bungalow, staff quarters, guest houses, and water supply distribution systems are included in its precincts. P.I.L. has built various categories of staff quarters, both low-rise and high-rise, for the Medical College at Rajkot.
P.I.L. has contributed in yet another way, both to the state of Gujarat and to the nation. In the wake of the terrible earthquake in January 2001, heritage structures like the 90 years old Jamnagar Circuit house building were severely damaged and adhering to the stipulations of the Government of Gujarat. Its exquisite Roman architectural features were retrofitted and strengthened while we retained its original aesthetic glory.
World bank funded punjab state road sector Project - Improvement Rehabilitation Resurfacing & Routine Maintenance work of Road of Sangrur - Mansa - Bhatinda Contract Area under OPRC.
Value of Work Rs.596.36 Cr. (Rupees Five Hundred Ninty Six Crores and Thirty Six Lacs.)
Construction of 4-lane Road on NH-12 New NH-52 from Km 299.000 to 346.540 Design Chainage From 9.860 to 58.740 Darah-Jhalawar-Teendhar section in the State of Rajasthan under NHDP Phase-III Length 48.880 km Package II on Hybrid Annuity Mode.
Value of Work is Rs. 998 Crores (Rupees One Thousand One Hundred Twenty Three Crores and Sixty Three Lakh only).
Construction of Eight lane Vadodara Kim Expressway from Km 292.00 to Km 323.00 (Manubar to Sanpa Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on Hybrid Annuity Mode (Phase IA-Package III).
Value of work Rs. 1545.00 Crore (Rupees one thousand seven hundred twelve crores).
“Construction of Eight lane Vadodara Kim Expressway from Km 323.00 to Km 355.00 (Sanpa to Padra Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on EPC mode Project”
Value of Work Rs.1464.99 Cr. (Rupees One Thousand Four Hundred Sixty Four Crores and Ninety Nine Lacs )