In tradition of Road Construction and maintenance contracts, the contractor is responsible for the Execution of works which are normally defined by the Road administration or the Employer, and the contractor is paid on the basis of unit prices for different work items.

The result of traditional road contracts is in many cases less than optimal. In many cases the roads do not last as long as they should because of deficiencies in the original design, aggravated by inadequate maintenance which results in loss to the Road user in general.

For Improvement in traditional road construction practice and to ensure the maximum benefit to the Road user the concept of Output and Performance based contracting system has been adopted for this Project to Increase the efficiency and effectiveness of road asset management and maintenance. It ensures that the physical condition of the road under contract is adequate for the needs of road users over the entire period of contract which is normally several years.

This type of contract significantly expands the role of private sector, from the simple execution of works to the management and conversation of road asset. The OPRC as a model for road asset management is similar to Design, Build, Maintian, operate and transfer (DBMOT) model of contracts which addresses the issue of inadequate incentives. A Fundamental feature of the OPRC is that Contractor must not necessarily be a traditional works contractor, but can be any type of firm or business venture having the necessary technical, managerial and financial capacity to fulfil the contract.

Project
Area.

The Project area falls mainly in Sangrur, Mansa & Bathinda districts situated in the southern part of the Punjab in the heart of Malwa region.

The Main Road of the Network connects Bhawani Gadh Sunam Bhikhi Mansa Kechiya Kot Samir Bhatinda and the Branch of the Network connects other Major location with the Main Road i.e. Sangrur, Dhanuala, Mansa, Talwandi Sabo.

Location
Map of Project
Road.

locatio map

* Note : MAP Not to scale.

World Bank
Funded Project.

Output & Performance Based Road Contract for Improvement,Rehabilitation,Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bathinda Area in the State of Punjab.

Sr No

Section

Road Location

KM

Length(Km)

Existing Width (m)

Proposed Width of Road(m)

Road Type

Proposed Treatment

From

To

1

S1

Sangrur to sunam

0.000

11.300

11.300

10.0

10.0

MDR-21

Rehabilitation

2

S2

Bhavanigarh to Kota shamir

2.240

108.000

105.760

7.0

10.0

SH-12A

Improvement

3

S3

Harsingwah chowk to Mansa

119.600

127.000

7.400

10.0

10.0

SH-13

Rehabilitation

4

S4

Mansa to Talwandi Sabo

0.000

25.000

25.000

5.5

10.0

ODR-9

Improvement

5

S5

Dhanaula to Bhikhi

0.000

25.400

25.400

5.5

5.5

MDR-14

Rehabilitation

6

B8

Bhatinda to Talwadi sabo

9.000

38.000

29.000

7 & 10

7 & 10

SH-17

Rehabilitation

Total

203.860

 

 

 

 

Salient
Features
of the
Project.

1 Project Name 
Output & Performance Based Road Contract for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bathinda Area in the State of Punjab. (World Bank Funded Project)
2 Contract Number PSRSP/WB/OPRC/1/ICB
3 Client  Public Works Department (B&R) Punjab. 
4 Contractor Patel Infrastructure Ltd.
5 Associated Consultant  Feedback Infrastructure Services Ltd.
6 Total Contract Road Length 203.680 Kms.
7 Total Project Cost / Contract Value (INR) 5,963,614,900
8 Date Of Bidding 26th April 2012
9 Date of LOA 22nd Dec 2012
10 Date of Signing of Contract  10th Dec 2012 
11 Exp. Date of Completion  09th Dec 2022 
12 Duration of Contract 10 Years 

WORLD BANK
FUNDED PROJECT.

Output & Performance Based Road Contract for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bathinda Area in the State of Punjab.

Sr No Description Details Remarks
1 Letter of
Award

LOA have been issued for the Work on 22/10/2012

       
2 Signing of Agreement

Agreement Between Goverment of Punjab (PWD,B & R) & Patel Infrastructure Ltd. On 10/12/2012

       
3 Help Line Details
Sep-2013

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
4 Help Line Details
Oct-2013

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
5 Help Line Details
Nov-2013

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
6 Help Line Details
Dec-2013

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
7 Help Line Details
Jan-2014

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
8 Help Line Details
Feb-2014

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
9 Help Line Details
March-2014

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
10 Help Line Details
May-2014

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
11 Help Line Details
June-2014

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
12 Help Line Details
July-2014

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
13 Help Line Details
August-2014

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
14 Help Line Details
September-2014

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
15 Help Line Details
October-2014

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
16 Help Line Details
November-2014

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
17 Help Line Details
Dec-2014

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
18 Help Line Details
March-2015

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
19 Help Line Details
April-2015

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
20 Help Line Details
May-2015

Emergency Help Line no-1800 180 4040,have been displayed on the Project highway

       
21 Help Line Details
June-2015
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
22 Help Line Details
July-2015
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
23 Help Line Details
August-2015
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
24 Help Line Details
September-2015
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
25 Help Line Details
October-2015
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
26 Help Line Details
November-2015
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
27 Help Line Details
January-2016
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
28 Help Line Details
February-2016
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
29 Help Line Details
March-2016
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
30 Help Line Details
April-2016
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
31 Help Line Details
May-2016
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
32 Help Line Details
June-2016
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
33 Help Line Details
September-2016
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
34 Help Line Details
January-2017
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
35 Help Line Details
February-2017
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
36 Help Line Details
March-2017
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
37 Help Line Details
April-2017
Emergency Help Line no-1800 180 4040,have been displayed on the Project highway        
  First year of
work
First year of work completion Certificate dated 29/05/2014.        
  Incident/Petrol Vehicle 2 Nos of Incident/Patrol Vehicles are deplyoed on the Project Highway Current Location of the Vehicle-http://www.autocoptrackpro.com
  Inauguration of Work Inauguration of Work of S-2 & S-5 stretch have been carried Out by Honorable Shri sukhbir Singh Badal-Dy Chief Minister-Punjab on 12/08/2013.
  Awareness Camp Awareness Camps were Held at Mansa & Bhikhi for create awareness in Road user related to Environment,Safety and Health
  World Bank Officials Visit Official of World Bank Were Visit the site on 26/11/2013, 08/04/2014.

OPRC
Contact.

Contact Image one

Punjab Roads and Bridges Development Board,
SCO 61-62, Phase II, SAS Nagar,
Mohali (Chandigarh), Punjab

Contact Details

Shri Mukesh Kumar
PATEL INFRASTRUCTURE LTD.
Sunam Road, Sangrur,
Vil-Ramnagar Sibbian,
PO - Sangrur, Dist. - Sangrur,
Punjab - 148 001.
Mobile: 08288032772
Email : mukeshkumar@patelinfra.com


Contact Image one

Office of Executive Engineer,
Construction Division,
PWD B&R, Sangrur (Punjab)

Contact Details

Patel Infrastructure Ltd.
Village:Khiyala, Bapiyana Road,
Near Mansa Kaichhiya
Dist : Mansa(Punjab)


Branch Office

Patel Infrastructure Ltd, Patcon House, 80 Ft. Road,
Near Indira Gandhi Statue, Anand - 388 001,
anand@patelinfra.com