"The team of Patel Infrastructure Limited completed the Golden Jublee year with the ideologies laid down by our founders. We were delighted to celebrate five decades of concreting hopes, happiness, dreams and success stories !"    |    "PATEL INFRASTRUCTURE LIMITED created history on 2nd February, 2021 by setting World Record of a)Highest Quality Pavement Quality Concrete in 24 hours, b)Largest Quantum of Concrete produced by Ready Mix Concrete Plant in 24 hours c)Laying of Pavement Quality Concrete continuously in 24 hours, and d)Area of Rigid Pavement Quality Concrete laid in an Expressway in sq. mtrs. within 24 hours."

Area Of Expertise.

Patel Infrastructure Limited has been a connoisseur of infrastructure development for the last 51 years! Our focus on excellence and precision has allowed us to revolutionise the construction industry.

We take pride in being one of the oldest and most efficient companies in the construction industry and have unlocked many achievements in the stellar journey of five decades. From setting international records in roads and highway network projects to crafting civil administration buildings, Patel Infrastructure has become a symbol of trust and innovation in the construction industry.

Our operation domains can be classified into two major fields: Construction contract business and the second is the development of roads and highway networks across the country. We offer EPC services for reputed clients specialising in the roads and highways sector, including long stretch highways, bridges and a vivid range of building and other civil construction projects. The second branch of our business concerning the development of roads and highway projects is currently working on the hybrid annuity model ("HAM") basis (the "Annuity Business"), and through our Subsidiaries completed build, operate, transfer ("BOT") annuity projects.

Our clients.

AMC
AUDA
Gujarat univercity
ircon international limited
LIC
GMRCL
prbdb
VMC

Milestone.

2023

2023

Completed first HAM Project-Four Laning of Darah-Jhalawar-Teendhar Section of NH-12

PIL completed a 4-Lanned highway contract of NHAI - Darah-Jhalawar-Teendhar section of NH-12 Section on hybrid annuity mode having total project length is 48.88 km in Rajasthan.

2022

2022

Ganga Expressway-Group3, Uttar Pradesh

PIL secured Engineering, procurement and construction contract for development of access controlled six lane (expandable to eight lane) greenfield “Ganga Expressway” Group-3 starts from km 289+300 Village-Ubariya Khurd (Dist. Hardoi) & terminates at Village- Sarso (Dist. Unnao) (CH 445+000). The length of the proposed expressway alignment is 155.700 km in the state of uttar pradesh.

2021

2021

Concreting the History

PIL creates World Record for Laying Pavement Quality Concrete for a 2,580-m long, Eight-lane expressway (On Single 4 Lane Side)
- Highest Quality Pavement Quality Concrete in 24 hours
- Largest Quantum of Concrete produced by Ready Mix Concrete Plant in 24 hours
- Laying of Pavement Quality Concrete continuously in 24 hours
- Area of Rigid Pavement Quality Concrete laid in an Expressway in square meters in 24 hours

2020

2020

Delhi-Vadodara Expressway Package 30 on EPC Mode

EPC Project of Delhi-Vadodara Expressway package 30 was successfully secured by PIL. Most advanced machineries like Pakona(Precast Box Culvert etc), Pillng machine & Reinforcement Cutting & Binding Machine (Schnell)are planned to be procured for this. with establishing most advanced casting yard 1.8 KM long bridge over Narmada Canal to cast more than 32 Nos. of I-Girder at one time.

2019

2019

Eight Lanning of Manubar to Sanpa Section on HAM Mode & Sanpa to Padra Section on EPC Mode

First Eight Lane Expressway project with Rigid Pavement configuration was taken up by PIPL.It is the part of India's Longest Expressway connecting Delhi-Mumbai. PIL won 2 adjecent sections from Padra (Vadodara) to Manubar (Bharuch).

2018

2018

Four Laning of Darah-Jhalawar-Teendhar Section of NH-12 on HAM Mode

PIL secured a 4-Lanned highway contract of NHAI - Darah-Jhalawar-Teendhar section of NH-12 Section on hybrid annuity mode having total project length is 48.88 km in Rajasthan.

2017

2017

Four Laning of Sethiyahopu-Cholopuram & Cholopuram-Thanjavur Section of NH-45C in Tamilnadu on HAM Mode.

PIL secured the 2 adjecent highway contracts of NHAI on hybrid annuity mode having total project length of 100 km in Tamilnadu. For the first time, PIPL embarked its footprint in the southern region of the country.

2016

2016

Lambra-Shahkot Section of NH-71 & Moga - Tallewal Section of NH - 71 [EPC mode Project]

PIL secured the two adjecent EPC contracts of MoRTH in Punjab for the first time.
1. Lambra-Shahkot Section of NH-71, having total length 33.38 Km.
2. Moga - Tallewal section of NH - 71, having total length 35.200 Km

2015

2015

Road Construction Work involving Rehabilition Works at Ahmedabad to Vadodara Section of NH 8

PIL bagged the contract for rehabilition works of transforming 2/4 lane to 6 lane highway NH-8, which is the most busiest highway of the Country.

2014

2014

Development of Rail Over Bridge on BOT Annuity Basis

PIPL won the first BOT Annuity based contract for the Rail Over Bridge Contract grouped together at five various locations, the completion of which was before schedule.

2013

2013

Multi Storied Multi Speciality Hospital, V.S.Hospital, Ahmedabad

Keeping pace with history, PIPL continued the tradition of winning landmark projects & this time it was prestigious V.S.Hospital- Ahmedabad - the first hospital in Gujarat having ultra modern diagnosis facility & emergency response system with an equipped helipad.

2012

2012

OPRC Road Sector Project on SH-12 A, Punjab

Output and performance based road contract was designed for the first time in New Zealand with expertise from Europian & African countries. Our company became the first Indian conessionaire to undertake such OPRC project.

2011

2011

Ahmedabad-Vadodara Expressway NE-1

Challenging task of resurfacing of expressway was completed in six months by laying 4.00 lakh matric Ton of BC & DBM which is a record in itself.

2010

2010

Green Building Jilla Seva Sadan, Vyara

PIPL became the first company to execute the Green building concept in government buildings.

2009

2009

Gujarat Industrial Development Corporation, Ankleshwar

PIPL bagged new contract "Providing Infrastructure in Housing IV at GIDC Ankleshwar" which included work of Road, Water Supply Distribution Line, Drainage Work, Street light etc.

2008

2008

Developing Infrastrucutre Facilities [Gujarat Hira Bourse, Surat]

PIPL entered into Developing infrastructure facilities contracts by undertaking contracts of Roads Storm Water Drainage, W/s System, Sewerage System & Other Misc. Buildings.

2007

2007

Development to four lanes of Sardar Patel Ring Road, Ahmedabad

Development of Sardar Patel Ring Road (SPRR) to Four Lanes from two lanes enabling PIPL to enter into Road Infrastructure Development Contracts.

1986

1986

Water and Land Management Institute [WALMI]

The first project which was successfully executed by the second generation of the founder of the Company.